Technical Bulletins
- Federal Standard 209E
- A Modular Approach to Engineering Guidelines for Pharmaceutical Cleanroom Construction
- Leed Green Build Rating System
- AES Pharma 1/2" PVC Wall System
- 2" - 3" Pre-Engineered Modular Wall and Ceiling System
- The AES Hardwall Liner System
- Performance Properties of AES Pre-Engineered Modular Pharma Wall and Ceiling System
- Life Sciences Insights Camfil Farr.pdf
- Integrating Modular Design-Build Strategies into Biotech Projects (Meeting Schedule, Cost and Compliance Goals)
- Contamination Control: Common Portals to Quality Management
- Contamination Control: Root Cause Analysis
- Contamination Control: Minding the Cs and Qs
- Pharmaceutical Manufacturing, Nov/Dec 2008: Living the Biopharma Dream in Lincoln
- Tech Note: Basic Design/Build Features - BSL3 Facilities
- Tech Note: How Do You Keep a Cleanroom Clean?
- Tech Note: European Pharmaceutical Cleanroom Classification - GMP Rev B
- Tech Note: How "Clean" is Clean?
- Tech Note: What is the Greatest Source of Contamination in a Cleanroom?
- Tech Note: HVAC Consideration for your Cleanroom